Heliophysics Events Knowledgebase Coverage Registry (HCR)
Observation Details
SOT: Hinode Co-Alignment Obs N Limb
2009-12-03T00:15:00 to 2009-12-03T01:59:35
Science Goal: Hinode 3-Instrument Co-Alignment Observation
Program: North Limb coalignment, G-band only
Target: Alignment
xcen=0 ycen=945
Instrument: SOT
HOP/JOP: 0
Description: Co-alignment program run: Please run co-alignment program on Dec 1 or 2 for the three instruments. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 100 minutes for N-limb at 945 arcsec and 100 minutes for E limb at -945 arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA periods. - Even though XRT is not available, please run the program only with SOT and EIS.

Annotations:
Hits: 14
Chief Observer
Cruz
Related Links
Timeline: gif use
See also
Datasets
Get All Data
saaIntervals hiIntervals
contextwavelength: null cadence: fov: null,null images: null