SOTSP: Co-Alignment N Limb
2024-05-09T18:55:00 to 2024-05-09T20:12:00
Science Goal: Engineering
Program: N-limb Coalignment - Fast map, 14.4"x123", 1-side CCD, Q50
Target: Alignment
xcen=0 ycen=930
Instrument: SOTSP
HOP/JOP: 0
Description:
Co-alignment must run today (postponed from last plan due to Major Flare Watch) Co-alignment program run: Please run co-alignment program during the period for the three instruments. - If the solar condition is not permitted, please delay to the next timeline. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec. - Not necessary to be during SAA-free time. - For XRT, take G-band data every 5 minutes instead of 8 minutes. This is just for the N limb run. 8 minutes cadence is still OK for the E limb run. - For XRT, please take data even during SAA and twilight periods. - For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program - For EIS, please run Imada's new co-alignment program