SOTSP: Co-Alignment East Limb
2024-07-19T20:35:00 to 2024-07-19T20:51:30
Science Goal: Engineering (Co-Alignment)
Program: E-limb Coalignment - Fast map, 102.4"x20.3", 1-side CCD, Q50
Target: limb
xcen=-970 ycen=0
Instrument: SOTSP
HOP/JOP: 0
Description:
Co-alignment program run: Please run co-alignment program during the period for the three instruments. - If the solar condition is not permitted, please delay to the next timeline. - The sequence should start exactly 15 minutes after the pointing change to stabilize the satellite pointing drift. - 2 hours for N-limb at *** 930*** arcsec and 2 hours for E limb at *** -970*** arcsec. - Not necessary to be during SAA-free time. - For SOT, please use CTM HYSTERISIS (not CT RUN) at the start of each SP program
Annotations:
Hits: 67
Chief Observer
Cruz (RCO) --> Shine (RCO)
Related Links
See also
saaIntervals
hiIntervals
contextwavelength: null cadence: fov: null,null images: null
 |