Heliophysics Events Knowledgebase Coverage Registry (HCR)
The JSOC server room was significantly affected by flooding on 2024-11-26. JSOC team processes IRIS, AIA, and HMI Level 0 and Level 1 files; those data pipelines will be down until further notice.
Observation Details
Overview Where Groups: Mode, FOV, # spectra in map Data Links
2013-09-16 09:11:05-09:23:12
HOP 236 DC QS w/ SST, IRIS
SST-IRIS-Hinode campaign
x,y:0",32"
Max FOV:61"x61"
Target:Quiet Sun
Nearby Events
6302A Continuum Intensity61"x61"192 spectra
6302A Longitudinal Flux Density61"x61"192 spectra
6302A Transverse Flux Density61"x61"192 spectra
6302A Velocity 6301.5A61"x61"192 spectra

Level 1 Summary
Level 2 Summary
Level 1 Monthly
Level 2 Monthly
SP Cubes 1 MB
SOTSP: HOP 236 DC QS w/ SST, IRIS
2013-09-16T09:11:05 to 2013-09-16T09:23:12
Science Goal: SST-IRIS-Hinode campaign
Program: Fast map 61"x61", Q75
Target: Quiet Sun
xcen=0 ycen=32
Instrument: SOTSP
HOP/JOP: 236
Description: Request to SOT HOP Number 0236 run suitable SP and FG program for the target of the day, running larger maps when IRIS does so and higher cadence programs when IRIS does. Other Instruments: IRIS: the IRIS planner must submit his/her plan by 19 UT on Mondays - Fridays
the Friday plan runs for 3 days. No changes whatever are possible after ~21 UT of each weekday. The IRIS planner will announce the target type (one of the above list) for each day's observing in the 8-17 UT period at least 2 days in advance, so the Hinode daily meeting can plan to coordinate with suitable programs. The planner will also indicate the approximate times in which IRIS will be doing large-area rasters, and the times for small-FOV high-cadence programs. More specific pointing information will be provided in time for the Hinode daily meeting before uplink. SST: the observers at the SST will follow the IRIS target every day, at least during the prime observing time of 8-11 UT, and often during the extended time of 11-17 UT. Scientific Objectives: coordinated observing campaing using the Swedish Solar Telescope on La Palma, IRIS and Hinode is scheduled for August 25 - October 3, 2013. Observers at the SST will be from Oslo and LMSAL for this entire period. The goal is to obtain very high cadence, high spatial resolution observations of the photosphere and
chromosphere with CRISP to accompany the IRIS spectra and images of the chromosphere and transition region. CRISP data will allow measurement of line profiles for Doppler shifts and polarization for some magnetic field information above the photosphere. Hinode will contribute precise photospheric fields with SOT/SP, magnetogram evolution with SOT/NFI and coronal images and spectra with XRT and EIS. IRIS will be executing its initial "60-day science plan" throughout most of this time period. The IRIS 60-day plan has a variety of targets: AR sunspot, AR plage, QS, CH, filament on disk, and AR, QS, CH, prominence at the limb. This constitutes 9 different targets. In the 60-day plan these targets are observed repeatedly, but at varying mu angles, usually every few days. The goal should be to get decent datasets for all of these different targets, in order of priority. The exact priority order is to be determined, but limb observations are initially lower priority than disk observations given the extreme difficulty of obtaining good datasets at the limb from the SST. The best coordination time is from 9 am to noon La Palma time, which is 08 UT to 11 UT. During this La Palma time (8 to 11 UT), IRIS will focus on high cadence runs, such as sit-and-stare, small or medium rasters. The typical observing plan for the 60-day-plan is to dwell on one target for many hours, e.g., an active region, with a variety of shorter (typically 1 hour) observing programs during this time. The IRIS planner would typically schedule large raster scans for context before or after the La Palma time, so that high cadence programs are run during La Palma time. Additional IRIS observations during its SAA-free time (11-17 UT) could be of either type but would remain on the same target, for coordination with Hinode.

Request to SOT HOP Number 0236 run suitable SP and FG program for the target of the day, running larger maps when IRIS does so and higher cadence programs when IRIS does. Other Instruments: IRIS: the IRIS planner must submit his/her plan by 19 UT on Mondays - Fridays
the Friday plan runs for 3 days. No changes whatever are possible after ~21 UT of each weekday. The IRIS planner will announce the target type (one of the above list) for each day's observing in the 8-17 UT period at least 2 days in advance, so the Hinode daily meeting can plan to coordinate with suitable programs. The planner will also indicate the approximate times in which IRIS will be doing large-area rasters, and the times for small-FOV high-cadence programs. More specific pointing information will be provided in time for the Hinode daily meeting before uplink. SST: the observers at the SST will follow the IRIS target every day, at least during the prime observing time of 8-11 UT, and often during the extended time of 11-17 UT. Scientific Objectives: coordinated observing campaing using the Swedish Solar Telescope on La Palma, IRIS and Hinode is scheduled for August 25 - October 3, 2013. Observers at the SST will be from Oslo and LMSAL for this entire period. The goal is to obtain very high cadence, high spatial resolution observations of the photosphere and
chromosphere with CRISP to accompany the IRIS spectra and images of the chromosphere and transition region. CRISP data will allow measurement of line profiles for Doppler shifts and polarization for some magnetic field information above the photosphere. Hinode will contribute precise photospheric fields with SOT/SP, magnetogram evolution with SOT/NFI and coronal images and spectra with XRT and EIS. IRIS will be executing its initial "60-day science plan" throughout most of this time period. The IRIS 60-day plan has a variety of targets: AR sunspot, AR plage, QS, CH, filament on disk, and AR, QS, CH, prominence at the limb. This constitutes 9 different targets. In the 60-day plan these targets are observed repeatedly, but at varying mu angles, usually every few days. The goal should be to get decent datasets for all of these different targets, in order of priority. The exact priority order is to be determined, but limb observations are initially lower priority than disk observations given the extreme difficulty of obtaining good datasets at the limb from the SST. The best coordination time is from 9 am to noon La Palma time, which is 08 UT to 11 UT. During this La Palma time (8 to 11 UT), IRIS will focus on high cadence runs, such as sit-and-stare, small or medium rasters. The typical observing plan for the 60-day-plan is to dwell on one target for many hours, e.g., an active region, with a variety of shorter (typically 1 hour) observing programs during this time. The IRIS planner would typically schedule large raster scans for context before or after the La Palma time, so that high cadence programs are run during La Palma time. Additional IRIS observations during its SAA-free time (11-17 UT) could be of either type but would remain on the same target, for coordination with Hinode.

Annotations:
Hits: 42
Chief Observer
Cruz (RCO) -> Yasuda
Related Links
Cites: HOP 236 DC QS w/ SST, IRIS     
Timeline: gif use
See also
Datasets
Get All Data
saaIntervals hiIntervals

wavelength: 6302A Continuum Intensity cadence: 0 min fov: 61,61 images: 192 JavaScript Landing Page
wavelength: 6302A Velocity 6301.5A cadence: 0 min fov: 61,61 images: 192 JavaScript Landing Page
wavelength: 6302A Transverse Flux Density cadence: 0 min fov: 61,61 images: 192 JavaScript Landing Page
wavelength: 6302A Longitudinal Flux Density cadence: 0 min fov: 61,61 images: 192 JavaScript Landing Page
Time Series (SP Datacubes)